Thursday 5 July 2012

Risk Assessment Preliminary

















Here I considered the potential dangers and risks for both out health and addressing issues for filming our preliminary music video:

Location getting to the surgery:

I have already looked into the routes and directions from our school to get to the surgery  have done this by creating a post on blogger so that I refer back to it if i need it, this includes the lines we have to get on and stations as well as interactive widgets from google to get to the studio from the station, there is also many other features such as the timing of each one as well as creating a separate day schedule so we are not late which may affect our work.

Setting up at the surgery:

As the surgery has the similar setup and layout as in the Ed Sheeran Small Bump music video we do not need to change anything about it however we do need to take the camera and tripod from the media studies department to the surgery and plan out the type of shots we will take it from different angles and perspectives for example.

Fire at the surgery:

When we all visited the surgery to see layout we made not that the building did indeed have fire exits in case there was one also when entering the building you are required to sign in at reception, this is helpful as if we were missing a member we would know where he is by checking the signing in and out.

We will also make sure that we safely place out the equipment in case someone trips over wiring for example and injures themselves not to mention having phones with us at all times so that we communicate with each other if there is an issue of any kind as well as remembering to put them on silent so that it doesn't us when filming. We do not need to consider weather forecasts or reports as we plan on filming the shots for our music video in doors.

No comments:

Post a Comment